DAIKIN RXYQ72PAYD RXYQ96PAYD RXYQ108PAYD RXYQ144PAYD RXYQ168PAYD RXYQ192PAYD RXYQ72PATJ RXYQ96PATJ RXYQ108PATJ RXYQ144PATJ RXYQ168PATJ RXYQ192PATJ Manual

This manual introduces the composition, installation, use and maintenance of system air conditioners.


DAIKIN RXYQ72PAYD RXYQ96PAYD RXYQ108PAYD RXYQ144PAYD RXYQ168PAYD RXYQ192PAYD RXYQ72PATJ RXYQ96PATJ RXYQ108PATJ RXYQ144PATJ RXYQ168PATJ RXYQ192PATJ Manual - cover page
Brand
Daikin
Category
Air conditioner
Document type
Installation Guide
Language
English
Pages
25
File format
PDF
File size
1.3 MB
Published
06 August, 2012
Updated
30 September, 2023
Model
RXYQ72
MD5 checksum
4E513581F1C787E9DB0306771360EFB3

About this manual

This document is an installation manual for the Daikin RXYQ-PA Series VHV Inverter system air conditioners. It provides instructions for qualified personnel on selecting the installation location, inspecting and handling the unit, and placing the unit correctly. The manual covers essential procedures such as refrigerant piping, field wiring, vacuum drying, and pipe insulation.

What's inside

  • Introduction
  • Selection of Location
  • Inspecting and Handling the Unit
  • Placing the Unit
  • Refrigerant Piping
  • Field Wiring
  • IR Tight Test and Vacuum Drying
  • Pipe Insulation
  • Checking of Device and Installation Conditions
  • Additional Refrigerant Charge

Frequently asked questions

How long must you wait before turning off the power after stopping operation?

You must wait for at least 5 minutes before turning off the power to prevent water leakage.

What is the minimum required distance between power/control wires and televisions or radios?

Install the power supply and control wires at least 3.5 feet away from televisions or radios to prevent interference.

Download PDF (1.3 MB)

More Daikin Manuals


View all Daikin manuals →