Key facts
- Brand
- Daikin
- Model
- RXYQ72
- Category
- Air conditioner
- Industry
- Appliances
- Documents
- 2
- Languages
- EN
- Last added
- 2012-08-06
Start here

DAIKIN RXYQ72/96/144/168/192MTJU REYQ72/96/144/168/192MTJU Manual
This document serves as the operation manual for Daikin VRV system air conditioners, specifically models RXYQ and REYQ. It provides essential instructions for users regarding safe installation practices, proper usage of the remote controller, and understanding the COOL/HEAT selector functions.
The guide details operational procedures including how to start and stop the unit, optimal settings for various modes, and seasonal maintenance requirements. It also includes a section on troubleshooting common symptoms that are not actual air conditioner faults.
All Daikin RXYQ72 documents by type
Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.
Mounting, wiring and first power-up. Read it before the hardware goes in.
Questions answered in these manuals
What should be done before turning off the power after stopping operation?
Always wait at least five minutes before turning off the power to avoid water leakage and trouble.
From: DAIKIN RXYQ72/96/144/168/192MTJU REYQ72/96/144/168/192MTJU Manual
Who should perform inspection or service of the unit?
Never inspect or service the unit by yourself; ask a qualified service person to perform this work.
From: DAIKIN RXYQ72/96/144/168/192MTJU REYQ72/96/144/168/192MTJU Manual
How long must you wait before turning off the power after stopping operation?
You must wait for at least 5 minutes before turning off the power to prevent water leakage.
What is the minimum required distance between power/control wires and televisions or radios?
Install the power supply and control wires at least 3.5 feet away from televisions or radios to prevent interference.
