DAIKIN FXZQ07M7VJU FXZQ09M7VJU FXZQ12M7VJU FXZQ18M7VJU Manual

This manual provides installation and operation instructions for FXZQ07~18M7VJU series VRV system air conditioners. It includes safety issues, pre-installation preparation, refrigerant related information, selection of installation site, installation preparation, installation steps, refrigerant charging, system start-up, maintenance and maintenance, etc.


DAIKIN FXZQ07M7VJU FXZQ09M7VJU FXZQ12M7VJU FXZQ18M7VJU Manual - cover page
Brand
Daikin
Category
Air conditioner
Document type
Installation Guide
Language
English
Pages
20
File format
PDF
File size
1 MB
Published
06 August, 2012
Updated
01 October, 2023
MD5 checksum
A0850A94964BC2374761345168C2AD08

About this manual

This document serves as the official Installation and Operation Manual for Daikin VRV System air conditioners, specifically models FXZQ07M7VJU through FXZQ18M7VJU. It covers critical safety considerations, site selection, and detailed procedures for indoor unit installation, refrigerant piping, drain work, and electrical wiring.

What's inside

  • Safety Considerations
  • Before Installation
  • Selecting Installation Site
  • Indoor Unit Installation
  • Refrigerant Piping Work
  • Drain Piping Work
  • Electric Wiring Work
  • Wiring Example and Remote Controller Settings
  • Field Setting
  • Test Operation

Specifications

Documented ModelsFXZQ07M7VJU, FXZQ09M7VJU, FXZQ12M7VJU, FXZQ18M7VJU
System TypeVRV System air conditioners

Frequently asked questions

How long must one wait before turning off the power after stopping operation?

Always wait at least 5 minutes before turning off the power to avoid water leakage and trouble.

Can children play on or around the air conditioner unit?

No, do not allow children to play on or around the unit as they could be injured.

Download PDF (1 MB)

More Daikin Manuals


View all Daikin manuals →