This manual provides installation and operation instructions for FXZQ07~18M7VJU series VRV system air conditioners. It includes safety issues, pre-installation preparation, refrigerant related information, selection of installation site, installation preparation, installation steps, refrigerant charging, system start-up, maintenance and maintenance, etc.
This document serves as the official Installation and Operation Manual for Daikin VRV System air conditioners, specifically models FXZQ07M7VJU through FXZQ18M7VJU. It covers critical safety considerations, site selection, and detailed procedures for indoor unit installation, refrigerant piping, drain work, and electrical wiring.
| Documented Models | FXZQ07M7VJU, FXZQ09M7VJU, FXZQ12M7VJU, FXZQ18M7VJU |
|---|---|
| System Type | VRV System air conditioners |
Always wait at least 5 minutes before turning off the power to avoid water leakage and trouble.
No, do not allow children to play on or around the unit as they could be injured.