Kangaroo Joey Enteral Feeding Pump Set Loading and Hang Height Instructions

This document provides instructions for using the Kangaroo Joey™ enteral feeding pump, including loading instructions and hanging height instructions.


Kangaroo Joey Enteral Feeding Pump Set Loading and Hang Height Instructions - cover page
Brand
Kangaroo
Category
Professional medical equipment
Document type
User Manual
Language
English
Pages
2
File format
PDF
File size
182 KB
Published
03 August, 2012
Updated
28 September, 2023
MD5 checksum
2A197B04AB4B55E5FE51B84486923B61

About this manual

This document provides step-by-step instructions for properly loading the Kangaroo Joey™ enteral feeding pump. Users must follow specific procedures to fill or spike the feed container, insert the valve into the left pocket ensuring it is fully seated, and wrap the tubing around the rotor before inserting the retainer into the right pocket without overstretching.

What's inside

  • Set Loading Instructions
  • Valve Insertion
  • Tubing Installation
  • Hang Height Instructions

Frequently asked questions

How high must the feeding container be positioned above the pump?

The initial fluid line in the feeding set container must be 6 inches above the top of the feeding pump when initiating the feeding cycle.

What action turns the pump on?

To turn the pump on, press the power button located in the lower right-hand corner.

Download PDF (182 KB)

More Kangaroo Manuals


View all Kangaroo manuals →