This manual introduces the quick configuration method of the Promag 53 electromagnetic flow measuring system.
The manual provides safety instructions, installation guidelines, wiring diagrams and detailed commissioning steps for the Proline Promag 53 flow meter. It explains the Quick Setup menu, configuration of inputs/outputs, data storage and troubleshooting procedures.
Additional sections cover technical data, mechanical construction, accessories, and regulatory compliance. The document is intended for qualified personnel who install, commission, and maintain the device in process automation environments.
| Minimum conductivity for demineralized water | 20 µS/cm |
|---|---|
| Minimum conductivity for most fluids | 5 µS/cm |
| Safety standard compliance | EN 61010, EN 61326/A1, NAMUR NE 21 |
The device requires a minimum conductivity of 20 µS/cm for measuring demineralized water.
Installation, commissioning and maintenance must be carried out by trained, qualified specialists authorized by the facility’s owner‑operator.
It complies with EN 61010, the EMC requirements of EN 61326/A1, and NAMUR recommendation NE 21.