Overvoltage control operation or PB operation in progress indicates PB operation level + 3% (200V class: 370Vdc, 400V class: 740Vdc). The manual's first action is: “Overvoltage control operation or PB operation in progress. ON: PB operation level + 3% (200V class: 370Vdc, 400V class: 740Vdc).”
- Model
- Toshiba VF-AS1
- Display shows
- 22
- Type
- Alarm code
- Source
- Manual p. 200
What 22 means
What to do
- Overvoltage control operation or PB operation in progress. ON: PB operation level + 3% (200V class: 370Vdc, 400V class: 740Vdc). p. 200
Before you service the product, read the safety instructions in the manual p. 17.
If 22 is still not resolved
- Read the Instruction Manual p. 17 “Read the Instruction Manual.”
This page summarises what the manufacturer’s manual says about 22; each statement links to the page it comes from, and quoted lines are copied word for word. It is not a substitute for the manual or for a qualified installer. ManualLib is not affiliated with Toshiba. Found a mistake? Report an error.
