Key facts
- Manuals
- 2
- Languages
- EN
- Last added
- 2023-10-26
Featured Aerco manuals

Benchmark Boilers Models 750 through 6000 BMK Series Boilers Pre-Installation Gas Supply Guide
This document serves as a pre-installation gas supply design guide for AERCO Benchmark Low NOx gas-fired boilers, specifically Models 750 through 6000. It outlines the necessary gas train components, including safety shutoff valves and air/fuel valves, to ensure efficient combustion and safe operation. The guide emphasizes the importance of adhering to specified gas pressure requirements and local authority regulations during the design and installation phases.
Covers: Safety Precautions · Gas Train Components · Gas Pressure Requirements · Manual Shutoff Valves · Pressure Regulators · Custom Gas Trains

AERCO Benchmark Series Boilers Pre-Installation Electrical Power Guide
This guide is intended to help designers provide electrical power wiring (line voltage) to Benchmark gas-fired boilers, which are fully factory wired packaged units. It covers domestic and international models ranging from the BMK 750 to the BMK 6000. The document specifies power options including voltage, phase, and amperage for various model ranges and regions.
Covers: Disclaimer · Power Options · Power Box Location · Power Box Components · Emergency Shutoffs · Wiring Schematics
Latest Aerco manuals
Benchmark Boilers Models 750 through 6000 BMK Series Boilers Pre-Installation Gas Supply Guide
Service Manual 17 pages · 1001 KB · ENPre-installation gas supply design guide for AERCO Benchmark BMK Series boilers, covering pressure requirements, regulator sizing, and safety precautions.
AERCO Benchmark Series Boilers Pre-Installation Electrical Power Guide
Installation Guide 11 pages · 1.3 MB · ENTechnical guide for providing electrical power wiring to AERCO Benchmark gas-fired boilers, covering models 750 through 6000.
Which document do I need?
Service Manual
Disassembly, diagnostics and part numbers, for repair.
Installation Guide
Mounting, wiring and first power-up. Read it before the hardware goes in.
Questions answered in Aerco manuals
Is an external manual shutoff valve required?
Yes, an external manual shutoff valve must be installed at each Benchmark boiler.
From: Benchmark Boilers Models 750 through 6000 BMK Series Boilers Pre-Installation Gas Supply Guide
When is a lock-up type pressure regulator required?
An external lock-up type regulator is required where gas supply pressure will exceed 14.0" W.C. (3.49 kPa).
From: Benchmark Boilers Models 750 through 6000 BMK Series Boilers Pre-Installation Gas Supply Guide
Where is the power box for field wiring connections located?
For all Benchmark models, the power box is located in the upper right corner behind the unit front panel.
From: AERCO Benchmark Series Boilers Pre-Installation Electrical Power Guide
What type of conductors should be used for field wiring?
Only copper conductors should be used for field wiring connections.
From: AERCO Benchmark Series Boilers Pre-Installation Electrical Power Guide
