AERCO Benchmark Series Boilers Pre-Installation Electrical Power Guide

This document describes the electrical power connections required for Benchmark (BMK) gas fired boilers prior to installation.


AERCO Benchmark Series Boilers Pre-Installation Electrical Power Guide - cover page
Brand
Aerco
Category
Other
Document type
Installation Guide
Language
English
Pages
11
File format
PDF
File size
1.3 MB
Published
13 October, 2023
Updated
13 October, 2023
MD5 checksum
B42A5250AACE4B0DE0E2E2E8C6074009

About this manual

This guide is intended to help designers provide electrical power wiring (line voltage) to Benchmark gas-fired boilers, which are fully factory wired packaged units. It covers domestic and international models ranging from the BMK 750 to the BMK 6000. The document specifies power options including voltage, phase, and amperage for various model ranges and regions.

What's inside

  • Disclaimer
  • Power Options
  • Power Box Location
  • Power Box Components
  • Emergency Shutoffs
  • Wiring Schematics
  • Multiple Unit Wiring

Specifications

BMK 750 — 1000 Domestic Voltage120 V 1@ / 60 Hz
BMK 750 — 1000 International Voltage220 V 1@ / 50-60 Hz
BMK 1500 — 2000 Domestic Amperage20
BMK 2500 - 3000 Domestic Voltage460 V 32 / 60 Hz
BMK 5000 - 6000 Canada Voltage575 V 3@ / 60 Hz

Frequently asked questions

Where is the power box for field wiring connections located?

For all Benchmark models, the power box is located in the upper right corner behind the unit front panel.

What type of conductors should be used for field wiring?

Only copper conductors should be used for field wiring connections.

Is an emergency shutoff required for the unit?

Yes, an emergency switch (electrical shutoff) must be in series with power to the unit.

Download PDF (1.3 MB)