Tramex CME5 Manuals

ManualLib has 2 documents for the Tramex CME5 (Other): 2 user manuals. Every file can be read online or downloaded as a PDF for free.

User Manual 2

Key facts

Brand
TRAMEX
Model
CME5
Category
Other
Industry
Industrial
Documents
2
Languages
EN
Last added
2026-11-03

Start here

Tramex CME5 Concrete Moisture Encounter User Guide

Tramex CME5 Concrete Moisture Encounter User Guide

User Manual 18 pages · 334 KB · EN

The Tramex CME5 is a non-invasive handheld electronic instrument designed for accurate, instant, and non-destructive testing of moisture content in concrete and cementitious slabs and screeds. It provides readings equivalent to the Carbide Method for both concrete and anhydrite substrates. The device is intended for use in the flooring, water damage restoration, inspection/surveying, and indoor air quality industries.

Read online

Tramex CME5 specifications

Measurement Depthapproximately 20mm (3/4")
Concrete Scale Range0 - 6 % moisture by mass/weight
Automatic Power Off5 minutes of inactivity

Source: Tramex CME5 Concrete Moisture Encounter User Guide

All Tramex CME5 documents by type

User Manual 2

Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.

Questions answered in these manuals

How long should concrete floors dry before installation?

Typically a period of at least 3 to 4 weeks per 25mm (1inch) depth of concrete or sand/cement screed needs to be allowed.

From: Tramex CME5 Concrete Moisture Encounter User Guide

What is the warranty period for the CME5?

Tramex warrants the instrument for one year from the date of first purchase.

From: Tramex CME5 Concrete Moisture Encounter User Guide

What industries is the CME5 suitable for?

The instrument is designed for the Flooring, Water Damage Restoration, Inspection/Surveying and Indoor Air Quality industries.

From: Tramex CME5 Concrete Moisture Encounter User Guide

How long should concrete floors dry before testing?

Typically a period of at least 3 to 4 weeks per 25mm (1inch) depth of concrete or sand/cement screed needs to be allowed.

From: Tramex CME5 Concrete Moisture Encounter User Guide