Key facts
- Brand
- dymax
- Model
- BlueWave 200
- Industry
- Industrial
- Documents
- 2
- Languages
- EN
- Last added
- 2026-10-21
Start here

Dymax BlueWave 200 Version 3.0 Quick Start Instructions
This document provides quick start instructions for the Dymax BlueWave 200 Version 3.0 UV curing system. It details the steps for assembling the lightguide, connecting power and optional foot pedals, and operating the unit after a bulb warm-up period. Important safety notes and contact information for Dymax Corporation are also included.
Read onlineAll Dymax BlueWave 200 documents by type
The shortest path to a working setup, usually only a few pages.
Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.
Questions answered in these manuals
How long must the bulb warm up before operation?
You must allow the bulb to warm up for 5 minutes after turning it on.
From: Dymax BlueWave 200 Version 3.0 Quick Start Instructions
What tool is provided to tighten the setscrew on the Lightguide Mount?
A Hex Wrench is provided with the system for tightening the setscrew.
From: Dymax BlueWave 200 Version 3.0 Quick Start Instructions
What safety equipment is required to protect eyes from UV exposure?
Users must always wear UV-blocking protective goggles or a face shield when working with or near the BlueWave 200.
From: Dymax BlueWave 200 UV Light-Curing Spot Lamp User Guide
What clothing is recommended to protect the arms while operating the lamp?
Long-sleeved shirts or a lab coat are recommended to protect the arms.
From: Dymax BlueWave 200 UV Light-Curing Spot Lamp User Guide
