Quick start instructions for assembling, connecting power, and operating the Dymax BlueWave 200 Version 3.0 UV curing system.
This document provides quick start instructions for the Dymax BlueWave 200 Version 3.0 UV curing system. It details the steps for assembling the lightguide, connecting power and optional foot pedals, and operating the unit after a bulb warm-up period. Important safety notes and contact information for Dymax Corporation are also included.
You must allow the bulb to warm up for 5 minutes after turning it on.
A Hex Wrench is provided with the system for tightening the setscrew.
The shutter is opened and closed by means of the Foot Pedal.