VORTAB Flow Conditioner Installation and Operation Guide

Installation and operation guide for VORTAB flow conditioners including VIP, VIS, VMR, VSR, VEL, and VFK models.


VORTAB Flow Conditioner Installation and Operation Guide - cover page
Brand
VORTAB
Document type
Installation Guide
Language
English
Pages
20
File format
PDF
File size
1007 KB
Published
05 November, 2026
Updated
05 November, 2026
MD5 checksum
15040BDBAC4F39FBD0EAB66E0AC05409

About this manual

This guide provides detailed installation procedures and operational guidelines for VORTAB flow conditioners. It covers various models including Insertion Panel (VIP), Insertion Sleeve (VIS), Meter Run (VMR), Short Run (VSR), Elbow (VEL), and Field Kit (VFK). Each model is designed to establish a uniform, non-swirling velocity profile downstream from flow meters or process equipment. Installation methods include flange mounting, welding, or field assembly, with specific orientation and spacing requirements to ensure optimal performance and minimal pressure loss.

The document also includes technical specifications for each model, detailing materials, pipe sizes, connection types, and length requirements. It emphasizes the importance of correct installation to avoid flow disturbances, cavitation, and equipment damage. Orientation is critical for VIP models, and the guide provides visual references and step-by-step instructions for proper installation.

What's inside

  • General Theory of Operation
  • Technical Specifications
  • Installation - General
  • Vortab Insertion Panel (VIP) Installation
  • Vortab Insertion Sleeve (VIS) Installation
  • Vortab Meter Run (VMR) Installation
  • Vortab Short Run (VSR) Installation
  • Vortab Elbow (VEL) Installation
  • Vortab Field Kit (VFK) Installation

Specifications

Vortab Insertion Sleeve (VIS) Material316L SST & Hastelloy C-276 for all sizes, Carbon steel for sizes 4.51 inch and higher
Vortab Meter Run (VMR) Length7 nominal pipe diameters (7D)
Vortab Short Run (VSR) Length3 nominal pipe diameters (3D)
Vortab Insertion Panel (VIP) Material316L Stainless Steel
VIP Orientation TabsOne orientation tab and one orientation handle 180º offset for sizes below 24.40-inches (620 mm), two orientation tabs offset 180º for sizes 24.40" and above

Frequently asked questions

How is the Vortab Insertion Sleeve (VIS) installed?

The VIS must be sized to fit the process pipe or duct and can be welded in place or secured with a capture flange. The outlet must be located three to four nominal pipe diameters (3D - 4D) upstream from the customer meter.

What materials are used in Vortab Meter Run (VMR)?

VMR is constructed from 316L SST and Hastelloy C-276 for all sizes, with carbon steel available for sizes 8 inches and above.

What is the length of Vortab Short Run (VSR)?

The VSR is 3 nominal pipe diameters (3D) in length and includes only the flow conditioning internals.

Download PDF (1007 KB)