Key facts
- Manuals
- 1
- Languages
- EN
- Last added
- 2026-11-05
Featured VORTAB manuals

VORTAB Flow Conditioner Installation and Operation Guide
This guide provides detailed installation procedures and operational guidelines for VORTAB flow conditioners. It covers various models including Insertion Panel (VIP), Insertion Sleeve (VIS), Meter Run (VMR), Short Run (VSR), Elbow (VEL), and Field Kit (VFK). Each model is designed to establish a uniform, non-swirling velocity profile downstream from flow meters or process equipment. Installation methods include flange mounting, welding, or field assembly, with specific orientation and spacing requirements to ensure optimal performance and minimal pressure loss.
The document also includes technical specifications for each model, detailing materials, pipe sizes, connection types, and length requirements. It emphasizes the importance of correct installation to avoid flow disturbances, cavitation, and equipment damage. Orientation is critical for VIP models, and the guide provides visual references and step-by-step instructions for proper installation.
Covers: General Theory of Operation · Technical Specifications · Installation - General · Vortab Insertion Panel (VIP) Installation · Vortab Insertion Sleeve (VIS) Installation · Vortab Meter Run (VMR) Installation
Latest VORTAB manuals
VORTAB Flow Conditioner Installation and Operation Guide
Installation Guide 20 pages · 1007 KB · ENInstallation and operation guide for VORTAB flow conditioners including VIP, VIS, VMR, VSR, VEL, and VFK models.
Which document do I need?
Installation Guide
Mounting, wiring and first power-up. Read it before the hardware goes in.
Questions answered in VORTAB manuals
How is the Vortab Insertion Sleeve (VIS) installed?
The VIS must be sized to fit the process pipe or duct and can be welded in place or secured with a capture flange. The outlet must be located three to four nominal pipe diameters (3D - 4D) upstream from the customer meter.
From: VORTAB Flow Conditioner Installation and Operation Guide
What materials are used in Vortab Meter Run (VMR)?
VMR is constructed from 316L SST and Hastelloy C-276 for all sizes, with carbon steel available for sizes 8 inches and above.
From: VORTAB Flow Conditioner Installation and Operation Guide