Installation guide for TRISTAR FH21 three-arm full-height turnstile with components, steps, specs, and maintenance.
This document provides step-by-step instructions for installing the TRISTAR FH21 turnstile, including component assembly, alignment, wiring, and power setup. It also covers operation, battery backup options, and maintenance procedures for long-term reliability.
Key specifications include 15 people per minute throughput, 100% duty cycle, and 240VAC mains supply. Maintenance tasks are outlined for solenoids, locking pawls, and bearings, with recommended intervals for cleaning and greasing. This manual is written in Chinese.
| Throughput | 15 people per minute |
|---|---|
| Duty Cycle | 100% |
| Mains Supply | 1 Amp @ 240 VAC |
| Solenoid | 4 AMPS @12V DC |
| Controller | TL 100 B |
When battery backup is connected, it operates normally for 3000 operations.
The self-locking timeout is adjustable via dip switch from 3 to 10 seconds.
Do not grease or oil solenoids; use light grease only on shafts during locking roller servicing every 2 years.