TPI HV-8 caster kit installation and safety instructions for use with TPI High Velocity Fan stands.
This document provides instructions for the TPI HV-8 caster kit, which is intended for use with TPI High Velocity Fan stands on industrial air circulators. It includes important safety instructions to read and save before use.
Installation consists of assembling the casters onto the stand and securely tightening all fasteners. The casters must be locked before operating the fan, and the unit must not be moved while the blade is rotating or used on an inclined surface. For parts or additional information, contact TPI Customer Service Department at 1-800-251-0382.
It is a TPI caster kit intended for use with TPI High Velocity Fan stands.
Yes. Lock casters in place before operating the fan.
Qualified person(s) must do the work in accordance with all applicable codes and standards.
Call TPI Customer Service Department at 1-800-251-0382 or write to PO Box 4973, Johnson City, Tennessee.