Systemair TopvexFR03, FR06, FR08, FR11 Compact Air Treatment Unit Installation Instructions

Installation guide for Systemair TopvexFR03, FR06, FR08, and FR11 compact air treatment units, covering safety, dimensions, electrical specs, and mounting…


Systemair TopvexFR03, FR06, FR08, FR11 Compact Air Treatment Unit Installation Instructions - cover page
Brand
System air
Category
Air conditioner
Document type
Installation Guide
Language
French
Pages
24
File format
PDF
File size
2.2 MB
Published
02 November, 2026
Updated
02 November, 2026
MD5 checksum
1C26126A85F4E858DBFE4C0F6CF71A3C

About this manual

This document provides step-by-step installation instructions for Systemair’s TopvexFR03, FR06, FR08, and FR11 compact air treatment units. It includes safety warnings, technical specifications such as dimensions, weight, and electrical requirements, as well as detailed guidance on unpacking, mounting, duct connections, and control panel installation. The guide also covers optional features like VAV control and GTB/GTC communication interfaces. This manual is written in French.

What's inside

  • EU Declaration of Conformity
  • Safety Warnings
  • Product Information
  • Dimensions
  • Weight
  • Space Requirements
  • Electrical Specifications
  • Transport and Storage
  • Unpacking
  • Installation of the Unit

Specifications

Dimensions (FR03)1720 x 1115 x 540 mm
Weight (FR03)196 kg

Frequently asked questions

What are the dimensions of the TopvexFR03 unit?

The dimensions are 1720 x 1115 x 540 mm.

What are the model numbers of the air treatment units covered by this installation guide?

The guide covers models TopvexFR03, FR06, FR08, and FR11.

What is the maximum allowable distance between the control panel and the unit during installation?

The maximum allowable distance is 100 meters.

What is the required clearance height when installing a sliding door?

The required clearance height is 50 mm for the door support bars.

Download PDF (2.2 MB)