ROWA TANGO PRESS 20/24 and MAX PRESS 22/26 Pressure Pump User Manual

User manual for ROWA TANGO PRESS 20/24 and MAX PRESS 22/26 pressure pumps, covering installation, electrical connection, startup, troubleshooting and warranty.


ROWA TANGO PRESS 20/24 and MAX PRESS 22/26 Pressure Pump User Manual - cover page
Brand
ROWA
Category
Other products
Document type
User Manual
Language
Spanish
Pages
19
File format
PDF
File size
2.3 MB
Published
15 November, 2026
Updated
15 November, 2026
MD5 checksum
562A689E3637543C0E26367EE13FF7D6

About this manual

This manual covers ROWA TANGO PRESS 20/24 and MAX PRESS 22/26 pressure pumps. It describes hydraulic and electrical installation, location and protection, purging and first startup, automatic control regulation, troubleshooting, and warranty information.

The pumps combine a Rowa pump with an RPX control that starts the pump when a tap or shower is opened and stops it when closed. The manual also includes technical characteristics, dimensions, performance curves, and component and contact information. This manual is written in Spanish.

What's inside

  • Presentación del producto
  • Dimensiones
  • Procedimiento indispensable para la instalación de un presurizador
  • Instalación hidráulica
  • Instalación eléctrica
  • Ubicación y protección
  • Purgado y primera puesta en marcha
  • Regulación del control automático
  • Verificación del correcto funcionamiento
  • Tablas para la detección y solución de problemas

Specifications

Pumped liquidClean water
Maximum water temperature40 °C
Maximum running time at minimum flow (200 l/h)24 hours
Winding insulation classClass F
Supply voltage220 V
TANGO PRESS 20 maximum pressure19 m.c.a.
TANGO PRESS 20 maximum flow4000 l/h
TANGO PRESS 24 maximum pressure23.5 m.c.a.
TANGO PRESS 24 maximum flow6000 l/h
MAX PRESS 22 maximum pressure21 m.c.a.
MAX PRESS 22 maximum flow5500 l/h
MAX PRESS 26 maximum pressure25 m.c.a.
MAX PRESS 26 maximum flow6500 l/h

Frequently asked questions

Does the pump require professional installation?

Yes, installation must be performed by a qualified installer.

What should be checked before first startup?

Verify that the voltage specified on the equipment matches the outlet voltage.

Must the pump shaft be horizontal?

Yes, the pump shaft must remain horizontal to avoid damage.

Is a check valve required?

Yes, the included check valve must always be installed.

Download PDF (2.3 MB)

More ROWA Manuals


View all ROWA manuals →