Peelle installation manual for double-section slide-up freight elevator doors, covering preparation, rail installation, door panels, chains, and interlocks…
This Peelle installation manual provides instructions for installing double-section slide-up landing doors on freight elevators. It is intended for elevator contractors and covers standard Peelle product components, with special designs referenced to separate installation drawings.
The manual includes pre-installation responsibilities, part number identification, door rail types and positioning, door panel and counterweight installation, chain adjustment, interlock setup, and final adjustments such as door operator alignment and panel leveling. This manual is written in Chinese.
| Hoist capacity for door panels | 1/2 ton [500 kg] |
|---|---|
| Power for power tools | 115 V or 230 V single-phase |
| Recommended side clearance | 3mm [1/8 in] |
| Acceptable frame deviation | 25mm [1 in] |
| Door-to-rail spacing (DBG) | 3mm [1/8 in] longer than guide shoe throat base |
The work requires two people.
Single-phase 115 V power is required, or 230 V where applicable.
A chain or electric hoist rated at 1/2 ton [500 kg] is required.