Quick start guide for the PC321 ZigBee power clamp: safety notices, technical specifications, single- and three-phase wiring, network joining and mounting.
The PC321 is a ZigBee power clamp that monitors electricity usage by connecting a clamp to a power cable. It measures Voltage, Current, Power Factor, Active Power and total energy consumption, and is compatible with single- and three-phase electricity. The guide opens with safety handling notices, then lists technical specifications such as ZigBee 2.4GHz connectivity, 100~240 Vac operating voltage, metering accuracy, dimensions and weight.
The document then describes the parts of the device (LED indicator, antenna port, three CT inputs, AC input cable and clamp), the function button and LED status meanings, and the installation procedure with three-phase and single-phase wiring diagrams. It ends with steps for joining a ZigBee gateway network using the Smartlift APP and for mounting the clamp with its mounting bracket.
| Wireless Connectivity | ZigBee 2.4GHz IEEE 802.15.4, ZigBee HA1.2 |
|---|---|
| RF Range (outdoor/indoor) | 100m / 30m |
| Antenna | Internal antenna (default), external antenna (optional) |
| Operating Voltage | 100~240 Vac 50/60 Hz |
| Power consumption | < 1W |
| Calibrated Metering Accuracy | ≤ 100W within ±2W; >100W within ±2% |
| Electrical parameters measured | Irms, Vrms, Active Power & Energy, Reactive Power & Energy |
| Operating environment | -20℃ ~ +55℃, humidity ≤ 90% non-condensing |
| Dimensions | 86(L) x 86(W) x 37(H) mm |
| Weight | 415g |
Press and hold the function button for ten seconds until the LED flashes green three times; the LED then flashes red, meaning the clamp is ready to join a network. Energy data is not cleared by this reset.
Reset the power clamp twice consecutively, with the interval between the two resets shorter than 10 seconds.
It means the device did not join the ZigBee network.
A ZigBee Gateway and the Smartlift APP installed in a mobile phone. Set the gateway to permit joining and the clamp joins automatically.
The arrow on the clamp should face the direction of current flow (P1 → P2). If it faces the reverse direction, the reading meter will display 0.