Patterson Pump Company Split Case Pumps General Inspection and Maintenance Schedule

A general inspection and maintenance schedule for Patterson Pump Company Split Case Pumps, outlining required actions at specific time intervals.


Patterson Pump Company Split Case Pumps General Inspection and Maintenance Schedule - cover page
Brand
Patterson Pump Company
Document type
Service Manual
Language
English
Pages
1
File format
PDF
File size
16 KB
Published
05 November, 2026
Updated
05 November, 2026
MD5 checksum
1A1398335BC0C94D209417A956BE99B8

About this manual

This document provides a general pump inspection and maintenance schedule for Split Case Pumps, excluding motors, engines, gear drives, VFDs, and controls. It outlines the required actions at different time intervals, such as routine inspections, servicing, and specific maintenance tasks.

What's inside

  • General Pump Inspection and Maintenance Schedule
  • Split Case Pumps
  • Routine Inspections
  • Servicing
  • Specific Maintenance Tasks
  • Notes on Applicability
  • Reference to Patterson O & M Manual

Frequently asked questions

What types of equipment are excluded from this inspection schedule?

This schedule excludes motors, engines, gear drives, VFDs, and controls.

When should running clearances be inspected and restored?

Running clearances must be inspected anytime a pump is opened and restored if they have doubled.

What is the required condition for a mechanical seal?

A mechanical seal should have no leakage.