Key facts
- Manuals
- 1
- Languages
- EN
- Last added
- 2026-11-05
Featured Patterson Pump Company manuals

Patterson Pump Company Split Case Pumps General Inspection and Maintenance Schedule
This document provides a general pump inspection and maintenance schedule for Split Case Pumps, excluding motors, engines, gear drives, VFDs, and controls. It outlines the required actions at different time intervals, such as routine inspections, servicing, and specific maintenance tasks.
Covers: General Pump Inspection and Maintenance Schedule · Split Case Pumps · Routine Inspections · Servicing · Specific Maintenance Tasks · Notes on Applicability
Latest Patterson Pump Company manuals
Patterson Pump Company Split Case Pumps General Inspection and Maintenance Schedule
Service Manual 1 pages · 16 KB · ENA general inspection and maintenance schedule for Patterson Pump Company Split Case Pumps, outlining required actions at specific time intervals.
Which document do I need?
Service Manual
Disassembly, diagnostics and part numbers, for repair.
Questions answered in Patterson Pump Company manuals
What types of equipment are excluded from this inspection schedule?
This schedule excludes motors, engines, gear drives, VFDs, and controls.
From: Patterson Pump Company Split Case Pumps General Inspection and Maintenance Schedule
When should running clearances be inspected and restored?
Running clearances must be inspected anytime a pump is opened and restored if they have doubled.
From: Patterson Pump Company Split Case Pumps General Inspection and Maintenance Schedule
