Installation instructions and parts list for O-MEGA II 6-inch oval steps, including step pad placement, hardware, and bracket mounting.
O-MEGA II 6-inch oval steps are installed by checking the required parts, placing and drilling step pads, attaching them with TEK screws, installing square head bolts and end caps, and fastening the step to mounting brackets with serrated flange nuts. The document includes a service parts list and a step pad location guide for several vehicle models.
A separate bracket application covers models 571339 and 401339 W2W MEGA/GRIP step brackets for 2013-2015 RAM 3500 pickups, including load reaction stud assembly, body-mount and shackle-mount bracket installation, and a service parts list.
| End cap nut torque | 5 lb ft |
|---|---|
| Step mounting nut torque | 19 lb ft |
| Load reaction stud flange nut torque | 19 lb ft |
| Step pad holes | (5) 1/8-inch holes per pad |
| Step pad fasteners | (5) 8-18 x 1/2-inch TEK screws per pad |
| Load reaction stud lengths | 4-inch stud for front bracket; 3-inch stud for rear brackets |
Each step pad is attached with five 8-18 x 1/2-inch TEK screws.
The end cap nuts are tightened to 5 lb ft.
The 5/16-inch serrated flange nuts are tightened to 19 lb ft.
No, the listed pad locations are only suggestions and may be placed at the purchaser's discretion.