This quick guide provides instructions for setting up, operating, and performing routine maintenance on the Kemppi SuperSnake GT02S and GT02SW subfeeders.
This document serves as a quick guide for the Kemppi SuperSnake GT02S and GT02SW subfeeders. It covers essential setup procedures including checking package contents, installing wire spools, threading filler wire, and connecting the subfeeder and welding gun. The guide also details specific connection requirements for the GT02SW model, which includes a rubber water hose protector for heavy industry applications and color-coded water hoses.
| Wire diameter (Fe, Ss, Al, MC, Fc) | 0.8 - 2.0 mm |
|---|---|
| Wire diameter (Steel spiral) | 1.4 – 2.0 mm |
| Wire diameter (DL-Chili) | 0.8 – 1.6 mm |
Press the WIRE INCH button once to load the wire automatically and stop.
It is designed for heavy industry applications to protect water hoses.
Clean with dry compressed air and keep the subfeeder cover open.