Jefa 150 KgM Direct Autopilot Drive Type I Installation Guide

Installation guide for the Jefa 150 KgM Direct Autopilot Drive Type I, covering electrical connections, mechanical mounting, noise reduction, and testing…


Jefa 150 KgM Direct Autopilot Drive Type I Installation Guide - cover page
Brand
Jefa
Category
Other
Document type
Installation Guide
Language
English
Pages
6
File format
PDF
File size
386 KB
Published
04 November, 2026
Updated
04 November, 2026
MD5 checksum
13BF179CBD7C66A5F1AD6F41F937FF93

About this manual

This document provides installation instructions for the Jefa 150 KgM Direct Autopilot Drive Type I. It details electrical connections for 12-volt systems, including compatibility with various autopilot junction boxes like Simrad, B&G, and Raymarine. The guide specifies wire gauges for clutch and drive outputs and notes the need for specific clutch voltage settings for certain brands.

The guide also covers mechanical installation, including offset distances for different operating centers and special considerations for rack and pinion systems. It includes recommendations for reducing noise and vibrations using supplied rubber washers and bushes, as well as a step-by-step testing procedure to verify system operation before final commissioning.

What's inside

  • Test data
  • Electrical Connections
  • Performance table
  • Compatibility
  • Mechanical installation
  • Rack and pinion system
  • Reducing noise level
  • Test the system
  • Maintenance
  • Declaration of conformity

Specifications

Output torque150 KgM
Motor Voltage12 Volts
Clutch voltage12 Volts
Clutch wire gauge0.75 mm²
Drive output wire gauge2 mm²
Average power consumption2 amps
Rudder travel72° (2x36°)
Output lever travel128°

Frequently asked questions

What is the average power consumption of the drive?

The average power consumption on 12 volts is 2 amps.

What clutch voltage setting is required for B&G autopilots?

The clutch voltage should be adjusted to 12 volts, as the default is 9 volts.

How often should bolted connections be checked?

All bolted connections should be checked yearly due to heavy vibrations.

Download PDF (386 KB)