Installation, operation, maintenance and troubleshooting guide for the Hyundai Marine Machinery MAXI 50/100/150 SL-1 WS incinerator.
This manual provides detailed instructions for installing the MAXI 50/100/150 SL-1 WS incinerator on board ships, including site preparation, diesel‑oil and waste‑oil supply piping, compressed‑air and flue‑gas connections, and required fire‑safety systems. It also covers storage conditions, component descriptions, and basic principles of combustion.
Operational procedures cover start‑up, temperature control, burner and sludge‑pump operation, as well as routine maintenance, lubrication schemes, and troubleshooting charts. Parts lists, component drawings, and technical data sheets for the primary burner, waste‑oil tank, mill pump (PU‑5) and other accessories are included.
| Calorie capacity (solid waste) | 372 kW (320,000 kcal/h) |
|---|---|
| Maximum solid waste processing rate | 100 kg/h |
| Maximum liquid waste processing rate | 38 kg/h |
| Total air consumption | 9,300 m³/h |
| Fuel oil consumption (max, heating) | Approx. 8 L |
| Compressed air pressure | 7–10 bar |
| Time to heat up to 700 ℃ | About 30 min |
The maximum suction head is 3 meters.