Quick start guide for Huawei SmartLogger 3000, covering installation, configuration, port connections, and safety precautions.
This guide provides step-by-step instructions for installing and configuring the Huawei SmartLogger 3000. It details port connections including RS485, MBUS, Ethernet, and power ports. Safety precautions are emphasized, including using insulated tools and PPE. The device supports connecting up to 80 or 150 solar inverters depending on model variant. It can be managed via FusionSolar or SUN2000 apps using WLAN.
The guide also covers cabling specifications, grounding requirements, and connection limits for RS485 cascades. It includes instructions for connecting DI, AI, DO, and power output cables, with recommended transmission distances of 10 meters or less for most signals. This manual is written in Japanese.
| Max Solar Inverters (Model A) | 80 |
|---|---|
| Max Solar Inverters (Model B) | 150 |
| RS485 Communication Distance | 1,000 m |
| Recommended Ethernet Cable | Cat 5e or higher, shielded RJ45 |
| DO Signal Voltage | 12 V |
A SmartLogger 3000A can connect to a maximum of 80 solar inverters.
The recommended RS485 communication distance is 1,000 meters or less.
The FusionSolar app is recommended for Huawei's FusionSolar system, and the SUN2000 app for other systems.
WLAN becomes available by default within 4 hours after startup.