Holmatro ICU / BCU 40 Industrial Cutter Maintenance Manual

Holmatro ICU / BCU 40 industrial cutter maintenance manual for daily and weekly preventive maintenance, hose checks, and torque checks.


Holmatro ICU / BCU 40 Industrial Cutter Maintenance Manual - cover page
Brand
Holmatro
Category
Industrial Supply
Document type
Service Manual
Language
Chinese
Pages
7
File format
PDF
File size
613 KB
Published
17 November, 2026
Updated
17 November, 2026
MD5 checksum
9433E176768AD7EEEF438A170A9E87E6

About this manual

This Holmatro service manual covers the ICU / BCU 40 industrial cutter. Daily preventive maintenance takes about 1-2 minutes and keeps the hydraulic shears in best condition.

The manual includes checks for hoses, quick connects and dust covers on ICU models, plus torque checks at 50 Nm with a 41 mm wrench and Teflon spray on hinge points. This manual is written in Chinese.

What's inside

  • Daily preventive maintenance
  • Weekly maintenance
  • Check hoses for damage and leaks
  • Check quick connects (ICU)
  • Check dust covers (ICU)
  • Check torque and spray hinge points

Specifications

Torque50 Nm (41mm)
Daily maintenance timeAbout 1-2 minutes

Frequently asked questions

How long does daily preventive maintenance take?

About 1-2 minutes.

What should be checked on the hoses?

Check for damage and leaks.

What torque is specified for the cutter?

50 Nm with a 41 mm wrench.

What is sprayed on all hinge points?

Teflon is sprayed on all hinge points.

Download PDF (613 KB)