Key facts
- Manuals
- 1
- Languages
- ZH
- Last added
- 2026-11-17
Featured Holmatro manuals

Holmatro ICU / BCU 40 Industrial Cutter Maintenance Manual
This Holmatro service manual covers the ICU / BCU 40 industrial cutter. Daily preventive maintenance takes about 1-2 minutes and keeps the hydraulic shears in best condition.
The manual includes checks for hoses, quick connects and dust covers on ICU models, plus torque checks at 50 Nm with a 41 mm wrench and Teflon spray on hinge points. This manual is written in Chinese.
Covers: Daily preventive maintenance · Weekly maintenance · Check hoses for damage and leaks · Check quick connects (ICU) · Check dust covers (ICU) · Check torque and spray hinge points
Latest Holmatro manuals
Holmatro ICU / BCU 40 Industrial Cutter Maintenance Manual
Service Manual 7 pages · 613 KB · ZHHolmatro ICU / BCU 40 industrial cutter maintenance manual for daily and weekly preventive maintenance, hose checks, and torque checks.
Which document do I need?
Service Manual
Disassembly, diagnostics and part numbers, for repair.
Questions answered in Holmatro manuals
How long does daily preventive maintenance take?
About 1-2 minutes.
From: Holmatro ICU / BCU 40 Industrial Cutter Maintenance Manual
What should be checked on the hoses?
Check for damage and leaks.
From: Holmatro ICU / BCU 40 Industrial Cutter Maintenance Manual
