Installation and operating instructions for Goodman IO-236E upflow/downflow coils, covering safety, application, refrigerant lines, and drain pan usage.
This document provides installation and operating instructions for Goodman IO-236E upflow/downflow coils. It includes safety instructions, codes and regulations, application information, refrigerant line preparation, evaporator coil metering device details, filler plate usage, and plastic drain pan application guidelines. The guide emphasizes proper installation procedures to ensure safety and compliance with regulations.
The manual uses symbols for DANGER (immediate hazards), WARNING (unsafe practices), and CAUTION (potential hazards).
A certified technician must perform the installation and service of this product.
The coil must be installed upstream (discharge air) of the furnace.