This manual provides installation, operating instructions, safety guidelines, and wiring diagrams for Goodman ARUF14 and ASPT14 air handlers.
This document serves as the official installation and operating guide for the Goodman ARUF14 and ASPT14 air handler units. It outlines critical safety precautions, shipping inspection procedures, and pre-installation considerations such as system matching and clearance requirements.
The guide details specific instructions for various installation orientations including upflow, downflow, horizontal left, and horizontal right configurations. It covers technical aspects like refrigerant line sizing, condensate drain connections, ductwork integration, electrical wiring, and low voltage thermostat connections.
| Power Supply | 208/240/1/60 electrical power supply |
|---|---|
| Service Clearance | Minimum of 24 inches in front |
Installation and repair should be performed by individuals meeting the requirements of an 'entry level technician' as specified by AHRI.
The unit must have an electrical ground circuit connecting the ground lug in the control box to the building electrical service panel.
No, the DFK (downflow) kit is not supplied with the air handler and must be obtained through a local distributor.