Franklin Fueling Systems Defender Series Below Grade Double Wall Spill Container Installation Guide

Installation guide for the Franklin Fueling Systems Defender Series below grade double wall spill container, covering preparation, installation, integrity…


Franklin Fueling Systems Defender Series Below Grade Double Wall Spill Container Installation Guide - cover page
Brand
Franklin Fueling Systems
Category
Industrial Supply
Document type
Installation Guide
Language
English
Pages
20
File format
PDF
File size
2.3 MB
Published
16 November, 2026
Updated
16 November, 2026
MD5 checksum
2D52370004DE424003A4F51D45A1E8F7

About this manual

This installation guide covers the Franklin Fueling Systems Defender Series below grade double wall spill container. It includes safety precautions, replacement parts, required equipment, torque specifications, and preparation for new and retrofit sites.

The guide also addresses electronic sensor preparation, installation steps, integrity testing, and maintenance and inspection recommendations.

What's inside

  • Introduction
  • Operating precautions
  • Replacement parts
  • Below Grade Spill Container
  • Preparation
  • Installation
  • Integrity testing
  • Maintenance

Specifications

Riser pipe height below finished grade17-19 in (430-480 mm)
Container elevated grade above finished grade1.0 in (25.4 mm)
M/F 4x4 adapter installed height1.75 in (45 mm)
Spill container to UST riser pipe torque125-150 ft-lbs (170-203 N-m)
Drop tube riser clamp to spill container torque75-100 ft-lbs (102-136 N-m)
Minimum loose cable for electronic sensor models10 ft (3 m)
Retrofit excavation size24 in diameter by 24 in deep
Minimum concrete removal around existing container36 in square

Frequently asked questions

What torque is required between the spill container and the UST riser pipe?

The specified torque is 125-150 ft-lbs (170-203 N-m).

How far below finished grade should the top of the riser pipe be?

The riser pipe top should be 17-19 in (430-480 mm) below finished grade.

How much cable should be left loose for electronic sensor models?

At least 10 ft (3 m) of cable should be left loose inside the manyway.

What excavation size is recommended for a retrofit application?

Excavate a 24 in diameter by 24 in deep area around the riser pipe.

Download PDF (2.3 MB)

More Franklin Fueling Systems Manuals


View all Franklin Fueling Systems manuals →