Emotron FLD48/52/69 AC Drive Installation & Getting Started Instruction

Installation and getting started guide for the Emotron FLD48/52/69 AC drive, covering frame sizes B-F and C2-F2, 0.75-200 kW.


Emotron FLD48/52/69 AC Drive Installation & Getting Started Instruction - cover page
Brand
Emotron
Category
inverter
Document type
Installation Guide
Language
English
Pages
68
File format
PDF
File size
6.8 MB
Published
16 November, 2026
Updated
16 November, 2026
MD5 checksum
924CC7B63B089DC1CA434B11606D2100

About this manual

This manual provides installation and getting started instructions for the Emotron FlowDrive FLD48/52/69 AC drive. It covers frame sizes B-F and C2-F2 with power ratings from 0.75 to 200 kW and is intended for persons who dimension, install, and commission the units.

Topics include safety instructions, mounting, cable connections, control connections, getting started, EMC standards, options, and technical data. The drive is dedicated to controlling wastewater pumps and can operate as a standalone unit or in a Master-Follower configuration.

What's inside

  • Safety Instructions
  • Introduction
  • Mounting
  • Installation
  • Control Connections
  • Getting Started
  • EMC and standards
  • Options
  • Technical Data
  • Index

Specifications

Power range0.75 - 200 kW
Frame sizesB - F and C2 - F2
FLD48 mains voltage230-480 V
FLD52 mains voltage440-525 V
FLD69 mains voltage500-690 V
Earth leakage currentexceeds 3.5 mA AC

Frequently asked questions

What mains voltage ranges apply to the FLD48, FLD52, and FLD69 models?

FLD48 uses 230-480 V, FLD52 uses 440-525 V, and FLD69 uses 500-690 V.

How long should you wait after switching off the mains supply before opening the AC drive?

Wait at least 7 minutes to allow the capacitors to discharge.

Which residual current device type is required for this product?

Only a Type B RCD is allowed on the supply side.

Download PDF (6.8 MB)

More Emotron Manuals


View all Emotron manuals →