CMI Cellini Plant on Parts Application Instructions

Instructions for applying CMI Cellini Plant on Parts to doors using hot glue, pins, or alternative adhesives.


CMI Cellini Plant on Parts Application Instructions - cover page
Brand
CMi
Category
Other
Document type
Other
Language
English
Pages
2
File format
PDF
File size
158 KB
Published
13 October, 2026
Updated
13 October, 2026
MD5 checksum
17B9194866DD65627C32C16FBA4540A6

About this manual

This document provides step-by-step instructions for applying Cellini Plant on Parts to door panels. The process involves dry fitting, pre-heating parts to approximately 100º F, applying adhesive via glue channels, and securing the parts with pins or nails. Specific attention is given to ensuring the parts are fully seated and perpendicular to the high slope inside the cove to prevent chipping.

What's inside

  • Materials Required
  • Dry Fit
  • Pre-heat the Parts
  • Apply Glue
  • Set the Part
  • Pinning and Nailing
  • Optional Assembly Processes
  • Safety and Notes

Specifications

Pre-heat temperatureapproximately 100º F
Pin length5/8" Long
Glue cure time4-6 minutes
Pin spacingapproximately 8" apart

Frequently asked questions

What is the recommended pre-heat temperature for the parts?

The parts should be pre-heated to approximately 100º F to ensure they lay flat and are pliable.

What adhesive is recommended for the glue channels?

A hot glue gun or an adhesive system comparable to 3M's Jet Weld system with a minimum cure time of 4-6 minutes is recommended.

Can cold press glue be used instead of hot glue?

Yes, a cold press glue such as National Casein PVC 54M acrylic adhesive can be used, but the parts must be held flat while the glue cures.

Download PDF (158 KB)

More CMi Manuals


View all CMi manuals →