Christie Velvet LED Display System Apex A2L Series Installation and Setup Guide

This guide provides installation and setup instructions for the Christie Velvet Apex A2L Series LED display system, covering hardware assembly, controller…


Christie Velvet LED Display System Apex A2L Series Installation and Setup Guide - cover page
Brand
Christie
Category
Other Electronics
Document type
Installation Guide
Language
English
Pages
42
File format
PDF
File size
1.7 MB
Published
17 November, 2026
Updated
17 November, 2026
MD5 checksum
55A59A4FD7A7FC2511AFF7144D5D5348

About this manual

This document serves as the Installation and Setup Guide for the Christie Velvet LED Display System Apex A2L Series. It details the procedures for installing LED arrays, mounting blocks, and carrier assemblies, as well as connecting data and power cables to the Remote Power Supply Rack Shelf. The guide also covers the configuration of E500 and E600 controllers, including software installation, firmware upgrades, and tile configuration review.

The manual includes critical safety precautions regarding electrostatic discharge, lifting requirements, and electrical codes. It provides step-by-step instructions for powering the array on and off, adjusting picture coordinates, and maintaining the LED panels. Additionally, it outlines regulatory compliance information, including FCC Class A digital device limits and environmental disposal instructions.

What's inside

  • Product overview
  • Important safeguards
  • General safety precautions
  • Power precautions
  • Installing an LED array
  • Connecting the data source cables
  • Configuring the E500 controller
  • Configuring the E600 controller
  • Maintaining the LED panels
  • Regulatory

Frequently asked questions

What are Velvet Apex tiles?

Velvet Apex tiles are modular image display units that can be configured to achieve an HD display, depending on the pixel pitch of the tile being installed.

What is required to safely lift, install, or move the product?

A minimum of two people or appropriately rated lift equipment is required.

What circuit breaker is required for the system?

A 13-20 A double pole mains circuit breaker certified for applicable local regulations is required. It must be part of the building installation and easily accessible.

Who must be present during installation?

A certified electrician must be present during installation to ensure the installation meets the local electrical code.

Download PDF (1.7 MB)

More Christie Manuals


View all Christie manuals →