BYD Floor Installation 1 Battery Module Tower Installation Guide

Installation guide for BYD's Floor Installation 1 Battery Module Tower, covering setup, wiring, safety, and module stacking.


BYD Floor Installation 1 Battery Module Tower Installation Guide - cover page
Brand
BYD
Document type
Installation Guide
Language
Chinese
Pages
2
File format
PDF
File size
18.8 MB
Published
22 November, 2026
Updated
22 November, 2026
MD5 checksum
0366039B69BABDE875DCF832915A94FA

About this manual

This guide details how to install and configure the BYD Floor Installation 1 Battery Module Tower, supporting 1 to 4 modules per tower with up to 8 towers in parallel. It includes steps for mounting, wiring DC and data cables, grounding, and connecting to an inverter. Safety precautions are emphasized, including indoor-only installation and handling of corrosive electrolytes. The guide also covers LED status indicators for normal and abnormal operation, and troubleshooting steps for communication or power failures. This manual is written in Chinese.

What's inside

  • Installation Steps
  • Wiring and Cable Connections
  • Safety Instructions
  • Module Stacking and Configuration
  • LED Status Indicators
  • Troubleshooting

Specifications

Max Modules per Tower4
Max Towers in Parallel8
Battery TypeLithium-ion Battery LV5.0 51.2V 5000Wh
DC Cable Size16mm2
Data Cable TypeCat5 Shield (Metal Shielded RJ45 of Cat5 or higher)

Frequently asked questions

Can multiple towers be connected?

Yes, up to 8 towers can be connected in parallel.

What should I do if the battery fails?

Contact BYD local after-sales service immediately.

Download PDF (18.8 MB)

More BYD Manuals


View all BYD manuals →