BYD Battery-Box Premium LV BMU - IP55 Instruction Manual

This is an instruction manual of Be Connect


BYD Battery-Box Premium LV BMU - IP55 Instruction Manual - cover page
Brand
BYD
Category
Other
Document type
User Manual
Language
English
Pages
6
File format
PDF
File size
5.3 MB
Published
12 October, 2023
Updated
12 October, 2023
MD5 checksum
C13FD0D9A127D8CFEA9C504A90C129D4

About this manual

This manual provides instructions for the BYD Battery-Box Premium LV BMU - IP55 (Battery Management Unit), which serves as a control unit for the BYD Battery-Box system. It details the scope of delivery, technical specifications, and port assignments for the device.

What's inside

  • Intended Use
  • Product Description
  • Scope of Delivery
  • Technical Data
  • Connection Diagram
  • Mounting and Connection
  • Commissioning
  • Updating Firmware
  • LED Status
  • Disposal

Specifications

Input voltage40-60 V
Input current200 mA
Weight2kg
Dimensions222 mm X 154 mm X 59 mm
Ambient temperature-10°C to 50°C
Relative humidity5% to 95%
Degree of protectionIP55

Frequently asked questions

What is the maximum length for the communication cable between BMU and an inverter?

The communication cable between BMU and an inverter cannot be longer than 10 meters.

Can the BMU firmware be updated independently?

No, the firmware of BMU could only be updated when it operates with Battery-Box.

What does a flashing white and blue LED indicate?

A flashing white and blue LED indicates that the battery system is initiating.

Download PDF (5.3 MB)

More BYD Manuals


View all BYD manuals →