Installation and safety instructions for the Barron LTG CLED Series exit sign, covering mounting, wiring, self-test operation, and LED indicators.
This installation guide provides safety safeguards and setup steps for the Barron LTG CLED Series exit sign. It warns to disconnect AC power before servicing and states that installation should be performed by qualified personnel only.
The document covers ceiling, end, and wall mounting, electrical connections for 120VAC and 277VAC, chevron removal, light pipe adjustment, and self-test/self-diagnostics with LED indicator status codes.
| Input Voltage | 120VAC, 277VAC |
|---|---|
| Initial Battery Charge Time | 24 hours |
| Automatic Battery Test Interval | 30 days |
Allow the battery to charge for 24 hours before first use.
It indicates normal AC power is being supplied and the battery is charged.
Press and hold the test button for 6 seconds.