Key facts
- Manuals
- 1
- Languages
- EN
- Last added
- 2026-11-23
Featured Barron LTG manuals

Barron LTG CLED Series Exit Sign Installation Instructions
This installation guide provides safety safeguards and setup steps for the Barron LTG CLED Series exit sign. It warns to disconnect AC power before servicing and states that installation should be performed by qualified personnel only.
The document covers ceiling, end, and wall mounting, electrical connections for 120VAC and 277VAC, chevron removal, light pipe adjustment, and self-test/self-diagnostics with LED indicator status codes.
Covers: IMPORTANT SAFEGUARDS · Ceiling or End Mount · Wall Mount · Removing Chevrons · Adjusting the Light Pipe · Electrical Connections
Latest Barron LTG manuals
Barron LTG CLED Series Exit Sign Installation Instructions
Installation Guide 4 pages · 733 KB · ENInstallation and safety instructions for the Barron LTG CLED Series exit sign, covering mounting, wiring, self-test operation, and LED indicators.
Which document do I need?
Installation Guide
Mounting, wiring and first power-up. Read it before the hardware goes in.
Questions answered in Barron LTG manuals
How long should the battery charge before first use?
Allow the battery to charge for 24 hours before first use.
From: Barron LTG CLED Series Exit Sign Installation Instructions
What does a steady green LED indicate?
It indicates normal AC power is being supplied and the battery is charged.
From: Barron LTG CLED Series Exit Sign Installation Instructions
