This manual provides instructions for the assembly, use, safety, maintenance, and storage of the ASC Mobile Scaffolding 75, compliant with EN1004-1 standards.
The ASC Mobile Scaffolding 75 is a mobile scaffold tower intended for various light work at height, providing a solid, stable, and safe work floor. It is not designed to be used as a stair tower or for access to other constructions. The manual details the components included in the kit and specifies that assembly should be performed by at least two people.
| Maximum load per square meter | 200 kg/m2 |
|---|---|
| Maximum total load | 375 kg |
| Maximum horizontal load | 30 kg |
| Minimum assembly personnel | Two people |
No, the mobile scaffold tower should not be used as a stair tower to provide access to other constructions.
Users must always wear work gloves, safety shoes, and a safety helmet, and use a life-line when working at height.
The maximum platform height is 6 meters when used outdoors with wind.