Arctic Industries Walk-In Cooler/Freezer Installation Operation Maintenance Warranty Manual

This manual provides installation, operation, maintenance, and warranty instructions for Arctic Industries walk-in coolers and freezers.


Arctic Industries Walk-In Cooler/Freezer Installation Operation Maintenance Warranty Manual - cover page
Brand
Arctic Industries
Document type
Installation Guide
Language
English
Pages
33
File format
PDF
File size
1.8 MB
Published
19 October, 2026
Updated
19 October, 2026
MD5 checksum
D1AA34DFCFA8511B7748F215D365AF79

About this manual

The document serves as a comprehensive guide for the erection and maintenance of Arctic walk-in cooler/freezer units. It details procedures for inspecting shipments, handling panels to prevent damage, and preparing the installation site by ensuring proper leveling and clearance from adjacent walls.

Key sections cover specific installation steps for floor panels, ceiling panels, wall panels, and door assemblies, including the use of cam-lock mechanisms and caulking sealants. The guide also addresses outdoor installations, diamond tread plate application, and provides instructions for completing the electrical and refrigeration contractor portions of the setup.

What's inside

  • General Information
  • Inspection of Shipment
  • Handling of Panels
  • Installation Procedure
  • Floor Panels Installation
  • Ceiling Panels Installation
  • Wall Panels Installation
  • Door Panels Installation
  • Outdoor Installation
  • Maintenance and Service

Frequently asked questions

What precautions should be taken when handling long panels?

Panels over 12' long must be held vertically or supported in the center section with additional manpower if handled flat to prevent denting.

How much clearance is required between the walk-in and adjacent walls?

A minimum of 2 inches of clearance or breathing space should be allowed for air circulation and to accommodate variations in building walls.

What type of sealant is recommended for panel seams?

Arctic supports the use of caulking sealant in between seams to make the unit as airtight as possible, using a 1/4" bead at a rate of about 25 linear feet per tube.

Download PDF (1.8 MB)