Arctic Industries Walk-In Cooler/Freezer Installation Operation Maintenance Warranty Manual
The document serves as a comprehensive guide for the erection and maintenance of Arctic walk-in cooler/freezer units. It details procedures for inspecting shipments, handling panels to prevent damage, and preparing the installation site by ensuring proper leveling and clearance from adjacent walls.
Key sections cover specific installation steps for floor panels, ceiling panels, wall panels, and door assemblies, including the use of cam-lock mechanisms and caulking sealants. The guide also addresses outdoor installations, diamond tread plate application, and provides instructions for completing the electrical and refrigeration contractor portions of the setup.
Covers: General Information · Inspection of Shipment · Handling of Panels · Installation Procedure · Floor Panels Installation · Ceiling Panels Installation

Arctic Walk-Ins Installation, Operation, Maintenance & Warranty Manual
This manual provides step-by-step instructions for installing Arctic Walk-In Coolers and Freezers, including handling panels, leveling floors, and attaching walls and doors. It also covers maintenance tasks like cleaning and replacing door hardware, as well as electrical schematics and warranty information. The guide emphasizes proper handling to avoid damage and includes important notes on concrete curing to prevent staining or corrosion.
Covers: General Information · Installation · Maintenance · Service · Electrical Schematics · Replacement Parts
Latest Arctic Industries manuals
Arctic Industries Walk-In Cooler/Freezer Installation Operation Maintenance Warranty Manual
Installation Guide 33 pages · 1.8 MB · ENThis manual provides installation, operation, maintenance, and warranty instructions for Arctic Industries walk-in coolers and freezers.
Arctic Walk-Ins Installation, Operation, Maintenance & Warranty Manual
Installation Guide 29 pages · 1.9 MB · ENInstallation, operation, maintenance, and warranty guide for Arctic Walk-In Coolers and Freezers.
Which document do I need?
Installation Guide
Mounting, wiring and first power-up. Read it before the hardware goes in.
Questions answered in Arctic Industries manuals
What precautions should be taken when handling long panels?
Panels over 12' long must be held vertically or supported in the center section with additional manpower if handled flat to prevent denting.
From: Arctic Industries Walk-In Cooler/Freezer Installation Operation Maintenance Warranty Manual
How much clearance is required between the walk-in and adjacent walls?
A minimum of 2 inches of clearance or breathing space should be allowed for air circulation and to accommodate variations in building walls.
From: Arctic Industries Walk-In Cooler/Freezer Installation Operation Maintenance Warranty Manual
What precautions should be taken when handling panels over 12 feet long?
You must hold these panels vertically, or if handled flat, you must support the center section with additional manpower.
From: Arctic Walk-Ins Installation, Operation, Maintenance & Warranty Manual
How far must the walk-in be spaced from adjacent walls?
A minimum clearance of 2 inches is required between the walk-in and adjacent walls.