Questions answered in Arctic Industries manuals

What precautions should be taken when handling long panels?

Panels over 12' long must be held vertically or supported in the center section with additional manpower if handled flat to prevent denting.

From: Arctic Industries Walk-In Cooler/Freezer Installation Operation Maintenance Warranty Manual

How much clearance is required between the walk-in and adjacent walls?

A minimum of 2 inches of clearance or breathing space should be allowed for air circulation and to accommodate variations in building walls.

From: Arctic Industries Walk-In Cooler/Freezer Installation Operation Maintenance Warranty Manual

What precautions should be taken when handling panels over 12 feet long?

You must hold these panels vertically, or if handled flat, you must support the center section with additional manpower.

From: Arctic Walk-Ins Installation, Operation, Maintenance & Warranty Manual

How far must the walk-in be spaced from adjacent walls?

A minimum clearance of 2 inches is required between the walk-in and adjacent walls.

From: Arctic Walk-Ins Installation, Operation, Maintenance & Warranty Manual