This manual provides detailed installation instructions for the APC InRow RC ACRC100 and ACRC103 cooling units, covering safety, equipment checks…
This document serves as an installation guide for the APC InRow RC ACRC100 and ACRC103 precision cooling units. It outlines essential procedures including safety warnings, equipment inspection, site preparation, and mechanical placement.
The guide details the complete installation process, covering the removal of panels, leveling and securing the unit to the floor or rack, connecting the chilled water piping system (with or without a CDU), and establishing electrical connections for power and user interfaces. This manual is written in Chinese.
All work must be performed by APC by Schneider Electric authorized personnel only.
All power must be turned off, and lockout/tagout procedures must be implemented to prevent electric shock or arc flash.
Sensors should be placed where there is insufficient cooling air, such as at the top of racks or behind obstacles that weaken airflow.