Key facts
- Manuals
- 1
- Languages
- ZH
- Last added
- 2026-10-13
Featured APC by Schneider Electric manuals

APC InRow RC ACRC100/ACRC103 Installation Manual
This document serves as an installation guide for the APC InRow RC ACRC100 and ACRC103 precision cooling units. It outlines essential procedures including safety warnings, equipment inspection, site preparation, and mechanical placement.
The guide details the complete installation process, covering the removal of panels, leveling and securing the unit to the floor or rack, connecting the chilled water piping system (with or without a CDU), and establishing electrical connections for power and user interfaces. This manual is written in Chinese.
Covers: General Information · Safety Information · Equipment Inspection · Site Preparation · Mechanical Installation · Piping System Connection
Latest APC by Schneider Electric manuals
APC InRow RC ACRC100/ACRC103 Installation Manual
Installation Guide 40 pages · 1.5 MB · ZHThis manual provides detailed installation instructions for the APC InRow RC ACRC100 and ACRC103 cooling units, covering safety, equipment checks…
Which document do I need?
Installation Guide
Mounting, wiring and first power-up. Read it before the hardware goes in.
Questions answered in APC by Schneider Electric manuals
Who is authorized to perform work on this equipment?
All work must be performed by APC by Schneider Electric authorized personnel only.
What safety precautions are required before working on the unit?
All power must be turned off, and lockout/tagout procedures must be implemented to prevent electric shock or arc flash.
