This manual describes recommended maintenance activities, inspection intervals, and replacement procedures for the ABB IRB 1200 industrial robot.
This document serves as a maintenance guide for the ABB IRB 1200 industrial robot. It outlines a structured maintenance schedule based on calendar time and operating hours, covering cleaning, inspection, and replacement tasks. The manual emphasizes safety precautions, such as disconnecting power and hydraulic/air pressure supplies before performing any service work.
| Document Part Number | 3HAC046983-001 |
|---|---|
| Revision | E |
| Copyright Period | 2014 - 2017 |
| Battery Life (Typical) | 36 months |
Maintenance intervals are specified in different ways, including calendar time (months) and operating time (hours).
The battery pack should be replaced when the battery low alert is displayed or if the remaining backup capacity is less than 2 months.
Before starting any maintenance work, ensure the robot is connected to protective earth and turn off all electric, hydraulic, and air pressure supplies.