This product is a new type of nut runner with a torque control system that can precisely control the tightening torque to ensure the tightening quality.
This is the March 2020 instruction manual for the Giken ANZM Nut Runner Series GSS/GSSW Torque Control System. It begins with before-operation and emergency precautions, then lists first power-on checks: cable connection, the 110.220Ω resistor on the COM port connector, SIO satellite station address setting, axis-number setting, wiring checks, and zero-point confirmation.
The table of contents covers the system outline, specifications, wiring connection, signals, and operation timing charts, including dimensional drawings and cable model tables for M-net and CC-Link versions.
| Terminating resistor setting | 110.220Ω on the COM port connector for each axis |
|---|---|
| SIO satellite station address parameter | Fn. 12 No. 3 |
| Axis number parameter | Fn.01 No. 26 |
| Wiring check parameters | [Fn.03 No.1] and [Fn.03 No.2] |
| Zero point confirmation parameter | Fn. 03 No. 2 |
Check the cable connection before power-on and set the resistor on the COM port connector for each axis. The resistor is not needed when only one axis is used.
Input the SIO satellite station address setting at “Fn. 12 No. 3” of the GSS controller; without it, SIO communication is not established. It is not required for PIO.
Set the axis setting “Fn.01 No. 26” from the panel so the controller driver recognizes the axis number. The axis number must also be set when the unit is replaced.
Immediately turn OFF all power switches of the main unit or connected equipment, or pull out all power cords from the plug outlets.