Giken ANZM Nut Runner Series GSS/GSSW Torque Control System Instruction Manual

This product is a new type of nut runner with a torque control system that can precisely control the tightening torque to ensure the tightening quality.


Giken ANZM Nut Runner Series GSS/GSSW Torque Control System Instruction Manual - cover page
Brand
Giken
Category
Automation control Equipment
Document type
User Manual
Language
English
Pages
126
File format
PDF
File size
9.4 MB
Published
29 November, 2023
Updated
29 November, 2023
MD5 checksum
4376012F5D567E128A52470941F3A3FD

About this manual

This is the March 2020 instruction manual for the Giken ANZM Nut Runner Series GSS/GSSW Torque Control System. It begins with before-operation and emergency precautions, then lists first power-on checks: cable connection, the 110.220Ω resistor on the COM port connector, SIO satellite station address setting, axis-number setting, wiring checks, and zero-point confirmation.

The table of contents covers the system outline, specifications, wiring connection, signals, and operation timing charts, including dimensional drawings and cable model tables for M-net and CC-Link versions.

What's inside

  • Before beginning operation
  • Measures in case of an emergency
  • Precautions to turn ON the power for the first time
  • System outline
  • Specifications
  • Wiring connection
  • Signal
  • Operation timing chart

Specifications

Terminating resistor setting110.220Ω on the COM port connector for each axis
SIO satellite station address parameterFn. 12 No. 3
Axis number parameterFn.01 No. 26
Wiring check parameters[Fn.03 No.1] and [Fn.03 No.2]
Zero point confirmation parameterFn. 03 No. 2

Frequently asked questions

What should be checked before turning on the power for the first time?

Check the cable connection before power-on and set the resistor on the COM port connector for each axis. The resistor is not needed when only one axis is used.

What setting is needed for SIO communication?

Input the SIO satellite station address setting at “Fn. 12 No. 3” of the GSS controller; without it, SIO communication is not established. It is not required for PIO.

How is the axis number set for the GSS controller?

Set the axis setting “Fn.01 No. 26” from the panel so the controller driver recognizes the axis number. The axis number must also be set when the unit is replaced.

What should be done if the product is in a dangerous condition?

Immediately turn OFF all power switches of the main unit or connected equipment, or pull out all power cords from the plug outlets.