Key facts
- Manuals
- 1
- Languages
- EN
- Last added
- 2023-11-29
Featured Giken manuals

Giken ANZM Nut Runner Series GSS/GSSW Torque Control System Instruction Manual
This is the March 2020 instruction manual for the Giken ANZM Nut Runner Series GSS/GSSW Torque Control System. It begins with before-operation and emergency precautions, then lists first power-on checks: cable connection, the 110.220Ω resistor on the COM port connector, SIO satellite station address setting, axis-number setting, wiring checks, and zero-point confirmation.
The table of contents covers the system outline, specifications, wiring connection, signals, and operation timing charts, including dimensional drawings and cable model tables for M-net and CC-Link versions.
Covers: Before beginning operation · Measures in case of an emergency · Precautions to turn ON the power for the first time · System outline · Specifications · Wiring connection
Latest Giken manuals
Giken ANZM Nut Runner Series GSS/GSSW Torque Control System Instruction Manual
User Manual 126 pages · 9.4 MB · ENGiken ANZM GSS/GSSW Nut Runner Torque Control System instruction manual covering initial power-on checks, wiring, signals and operation timing.
Which document do I need?
User Manual
Day-to-day operation, settings and troubleshooting. Start here if the product is already set up.
Questions answered in Giken manuals
What should be checked before turning on the power for the first time?
Check the cable connection before power-on and set the resistor on the COM port connector for each axis. The resistor is not needed when only one axis is used.
From: Giken ANZM Nut Runner Series GSS/GSSW Torque Control System Instruction Manual
What setting is needed for SIO communication?
Input the SIO satellite station address setting at “Fn. 12 No. 3” of the GSS controller; without it, SIO communication is not established. It is not required for PIO.
From: Giken ANZM Nut Runner Series GSS/GSSW Torque Control System Instruction Manual
