The Dell™ PowerEdge™ R900 is an excellent server for upgrading critical database applications from Oracle® 9i running on Solaris™ 9 to Oracle 10g R2, the latest release of Oracle’s data management platform, running on Solaris 10.
This document summarizes the approach recommended by Principled Technologies and Dell for migrating Oracle 9i databases to Oracle 10g R2 on a Dell PowerEdge R900 running Solaris 10. It compares the legacy Sun Fire V440 platform with the more expandable PowerEdge R900 and outlines application, database, installation, and post-migration considerations.
The summary includes step-by-step overviews for installing Solaris 10, preparing RAID and data drives, installing Oracle 10g R2, creating an empty database, exporting the Oracle 9i schema, importing it into Oracle 10g R2, and backing up the migrated database.
| Destination server processors | 4 x 6-Core E7450 Intel Xeon 2.4 GHz |
|---|---|
| Destination server memory | 64 GB |
| Destination server disks | eight Seagate SAS, 15K RPM, 73GB disks |
| Legacy server processors | 4 x UltraSparc IIIi 1.59 GHz |
| Legacy server memory | 32 GB |
| Legacy server disks | four Fujitsu Ultra320 SCSI, 73GB disks |
| PowerEdge R900 maximum RAM | 256 GB |
| PowerEdge R900 internal drives | eight |
| Performance comparison | over 14 times |
| Sample database size | 20 GB |
| Oracle 9i export time | 42 minutes |
| Oracle 10g R2 import time | 75 minutes |
Exporting the 20GB schema on the Sun Fire V440 took 42 minutes.
Importing the 20GB schema on the Dell PowerEdge R900 took 75 minutes.
The PowerEdge R900 can support 256 GB of RAM.
In some testing, the PowerEdge R900 delivered over 14 times the performance of the Sun Fire V440.