JS200, JS210, JS220, JS240, JS260 Service Manual

JS200, JS210, JS220, JS240, JS260 Service Manual


JS200, JS210, JS220, JS240, JS260 Service Manual - cover page
Brand
JCB
Category
Industrial Robot
Document type
Service Manual
Language
English
Pages
530
File format
PDF
File size
29.4 MB
Published
24 November, 2023
Updated
24 November, 2023
MD5 checksum
661D5287F3BDAF5BE13B2E75FC4F39E4

About this manual

This manual is designed for JCB Distributor Service Engineers and covers the maintenance and repair of hydraulic earthmoving equipment. It includes instructions for renewal of oil seals, gaskets, and components showing signs of wear, emphasizing that safety must come first during all procedures.

What's inside

  • General Information
  • Care & Safety
  • Routine Maintenance
  • Electrics
  • Hydraulics
  • Transmission
  • Brakes
  • Track & Running Gear
  • Engine
  • Body & Framework

Specifications

Travel Motor Bolt Torque270~310 Nm
Upper (Carrier) Roller Bolt Torque520~608 Nm
Counter weight Bolt Torque1058~1235/1335~1545 Nm
Hydraulic Oil Tank Bolt Torque235~285 Nm
Fuel Tank Bolt Torque255~285 Nm

Frequently asked questions

When should bolts and nuts be checked for looseness?

Bolts and nuts should be checked for looseness before and after daily work.

When should torque settings be applied after the running-in stage?

Torque settings should be applied after the first 50 hours of the running-in stage and every 250 hours thereafter.

How should torque figures for lubricated threads be adjusted?

Torque figures for lubricated threads may be reduced by one third compared to dry threads.

Download PDF (29.4 MB)

More JCB Manuals


View all JCB manuals →