The Goulds Pumps ITT Industries Installation and Operation Manual provides information on the pump model, pump serial number, control model number, and dealer information.
This document serves as the Installation and Operation Manual for the Goulds Pumps BF03S unit. It covers essential procedures including safety instructions, installation requirements for suction and discharge piping, wiring specifications, and operation with positive suction head. The guide also details priming instructions and seasonal service procedures.
| Voltage | 115/230V, single phase, 60 hz, A.C. |
|---|---|
| Priming Volume | 3 quarts |
| Cut-out Pressure | 40 psi |
Remove the priming plug on the motor adapter and fill the casing with water, then replace the plug and open a faucet.
Turn the 3/8" hex nut counterclockwise; one full turn changes the setting by 2 psi.