This document is the installation, operation and maintenance manual for submersible pumps.
This manual covers the installation, operation, and maintenance of CentriPro 4-inch submersible pumps. It includes essential safety instructions, an installation checklist, and guidance on typical setups involving piping, tanks, and pressure switches. The document emphasizes compliance with electrical codes and proper grounding to prevent hazards.
All motors require a minimum of 5 feet of submergence for proper refill check valve operation.
The tank pre-charge should be set to 28 psi, which is 2 psi below the system cut-in pressure.